English
English
Русский
Español
SaudiArabia
English
English
Русский
Español
SaudiArabiaAnnual Manufacturing Capacity
37000T
Cutting Material Workshop
Machinable
Coil Material
8000T
Machining Workshop
Pipe, Shaft Blank
Workable
12 Million Pieces
Stamping Workshop
Workable
Stamped Single Piece
300K Units Each
Welding Workshop
Processable Union-melting for the Compounding line
1.5 Million Pieces
Painting Workshop
Coatable Products
For Painting
1.6 Million Pieces
Assembly Workshop
Assemblable Products
.
Manufacturing Process
Raw Material Area
______________
The raw material is steel coil. We will prepare the material in advance to meet production and fast delivery. The entire process step will start from here: loading, spining, drawing and transport.
Product Stamping
______________
32T to 1000T stamping machine. From large to small parts, including all stamping parts except coverparts, with the production ability of 1.5 million parts.
And we add a new stamping automation line will further increase stamping production capacity.
Product Assembly
______________
According to different customers and different models,
The assembly workshop has a semi-automatic assembly production line. The products passing through the spoke production line and rim production line will be press mounted and union-melted here.
The monthly output can reach 130K pieces of finished products.
Finished Product Warehouse
______________
Inventory finished products are neatly stacked indesignated areas and locations according to product and customer requirements, and the first-in, first-out operation mode is maintained.